Under a breathalyzer purchase contract, equipment is sometimes received not all at once but in several installments. This happens when delivery locations are ready at different times, or when the quantity is large enough that shipping and item checks proceed in sequence. If you just add up the quantities on waybills or the number of boxes, it becomes hard to see how much of what the contract lists has arrived and which units are still at the checking or correction stage.
Partial delivery is a way of sending the goods agreed under one contract in several shipments. Quantities must be reconciled separately for the breathalyzer units and for any accessories listed as separate items in the contract, and units that came back as replacements because of a problem also need to be distinguished from new deliveries. The key is not to manage the contract total as a single arbitrary number but to keep the items in the contract documents separate from the actual movements in each shipment.
First confirm the conditions under which partial delivery is allowed
A supplier cannot decide to split deliveries just because the quantity is large or the supply schedule is tight. Article 12(3) of the provided "General Terms and Conditions for Goods Purchase (Manufacturing) Contracts" provides that partial delivery is not allowed except when requested by the contracting officer as needed or when permitted by the contract. So before starting to reconcile quantities, you need to read the contract, special conditions, and delivery instructions to see whether partial delivery is permitted and what the delivery conditions are for each installment.
You cannot assume these general terms apply identically to every purchase contract, because the terms used for national agency contracts and those of local governments or other public institutions can differ. An internal quantity sheet is management material for catching missing items or double counting; it is not material for judging, by itself, completion of contract performance, inspection results, or the scope of payment.
Use the contract's items and units as the basis for reconciliation
Rather than lumping everything together as "all breathalyzers," it is better to fix the contract total by the items and units written in the contract. If 10 units and 10 separate accessories are each contract items, keep separate quantity sheets for the units and the accessories. The fact that three boxes arrived or there are two waybills does not in itself mean you received a certain number of units.
You can suggest a management sheet that first lists item names and contract quantities, then records separately, for each installment, the quantity that actually arrived, the quantity whose checks are in progress, and the quantity linked to correction or replacement. In particular, "arrived" means the goods were transported to the delivery location, which is different information from the results of checking the goods within the organization. If you combine different information into one running total, the nature of the remaining work disappears from view.
Separate the reasons even when items are equally "not done"
When the contract quantity and the current quantity do not match, rather than showing the shortfall on one line, it is useful to distinguish why items remain outstanding. Goods that have not yet arrived, goods that are on site but still being checked, and goods linked to a replacement request call for different documents and different counterparties for the next check.
| Situation of the outstanding goods | Materials to look at together | What to record on the quantity sheet |
|---|---|---|
| Not yet at the delivery location | Contract item quantity and quantity shipped per installment | Items not yet arrived, expected installment, remaining quantity |
| Arrived but item checks are in progress | Shipping records for that installment and the status of checks | Quantity arrived and quantity awaiting checks |
| Correction or replacement in progress | The unit that first arrived and the replacement request | The link between the original unit and the replacement unit |
| Some goods have completed checks | Check records per installment and running totals by item | Quantity confirmed and remaining open cases |
For example, even if the truck for the final installment has arrived, units for which correction was requested in an earlier installment may still be outstanding. In this case, rather than marking all goods as settled based only on the quantity on the last waybill, look at the running totals by item together with the list of units being corrected. When you find a discrepancy, rather than adjusting earlier dates or quantities to fit the sheet, finding in which installment's shipping, arrival, or item check the discrepancy arose makes the records more reliable.
Record replacement units linked to the new shipment
Replacements are a typical point that makes the contract total look larger than it really is. As a hypothetical example, suppose the contract lists 10 breathalyzer units and 6 arrived in the first installment. If 5 of these have completed item checks and 1 is under a replacement request for correction, the quantity sheet can record the facts separately, such as "6 arrived," "5 checks complete," and "1 replacement in progress."
When the 1 replacement unit later arrives, for internal management it helps with duplicate checking to view it as linked to the replacement request from the first installment. If you automatically add the replacement as 1 new delivery, it can look as though both the unit that first arrived and the replacement unit count toward the contract quantity. For units with serial numbers, recording the serial number of the unit that first arrived, the serial number of the replacement unit, the reason for replacement, and the date of handling together makes the link easy to find.
However, which running total the arrival of a replacement unit should be reflected in can depend on the contract terms, the item check results, and how the original unit is returned or kept. So use the approach above not as a standard that determines contractual effect but as an internal reconciliation method for avoiding counting the same unit or the same replacement case twice.
At the end, look at installment totals and item-by-item status together
Installment records show when which goods moved, and item records let you compare the total quantity in the contract with the current status. At the final reconciliation, do not stop at simply adding up each installment's arrivals; set out side by side, for the units and for each separate accessory, the contract quantity, the quantity arrived, the quantity under checks, and the quantity related to replacement or correction. A situation where the number of units matches but separately listed accessories are still outstanding can also come to light at this point.
The state you can treat as settled for internal management is one where, for each item in the contract, the source of the quantities in each installment is confirmed, and the goods not yet arrived, under checks, or being replaced are clearly identified. If you compare this material with the contract documents and the organization's actual item check procedures, you can reduce the problem of matching only the shipped quantities and being left with unprocessed units. Whether contract performance is complete, and the scope of handling that follows, must be judged separately according to the contract terms and the organization's procedures.
※ This article provides general information and is not legal advice for any specific case. Consult a lawyer or other professional about your specific situation. Laws may be amended, so check the latest version at the Korea Law Information Center.